Lifting pre-made 3 bay roof sections with a 160T crane with a fly jib in an exposed location in the middle of winter was the easy bit !!!
Back propping down through every floor and punching up through the roof of a listed building wasn’t ????
This is the fourth different contract we have worked on at this Marina. This shows our designed truss out for the roof installation
Having worked with our client for over a year on the enabling works we are pleased to be awarded the scaffolding package on the main works.